69 lines
3.9 KiB
Markdown
69 lines
3.9 KiB
Markdown
# Explicit evaluation policy — draft implementation decision
|
|
|
|
Status: **DRAFT / NOT REGISTERED / NO SCIENTIFIC EXECUTION**.
|
|
|
|
This is a pre-outcome implementation choice by the coordinator for the existing
|
|
conditioning proposal. It does not change a frozen brain, eligibility-v2,
|
|
anatomical mask, odor identity, five-replicate matrix or scientific pass gate.
|
|
The AN engineering result remains separate; none of its 21 sources is edited.
|
|
|
|
## Probe timing and snapshots
|
|
|
|
- Every evaluation probe lasts 120 ms, with CS requests only in the half-open
|
|
interval [0, 100 ms). The remaining 20 ms is a no-CS tail. This matches the
|
|
proposed normal training CS duration; it is not the old L full-120-ms input.
|
|
- Normal, delayed and reversal curves use 0, 1, 2, 5, 10, 20 and 50 scheduled
|
|
reinforcement opportunities. Intermediate snapshots are taken after the
|
|
**complete epoch containing** that opportunity and its boundary update,
|
|
not immediately at the US tick.
|
|
- Terminal checkpoint 50 includes all planned epochs, including trailing
|
|
neutral or blank epochs. It is not an early snapshot chosen for response.
|
|
- Each snapshot executes both A and B evaluation inputs. No baseline-output
|
|
deduplication is assumed. Repeated probes use the same independent evaluation
|
|
input within a training replicate; they are paired observations, not new
|
|
training replicates. There are still five independent training replicates
|
|
per experimental cell and 80 independent A/B evaluation streams overall.
|
|
- Probe US and weight updates are disabled. A probe cannot update the training
|
|
or retention trajectory. Acquisition/reversal/delayed start from the common
|
|
declared reset state; retention forks the actual continuous saved state.
|
|
|
|
## Intermediate control alignment
|
|
|
|
For normal and delayed experiments, obtain the paired arm's complete ordered
|
|
CS prefix at the chosen epoch boundary. Match actual cue, occurrence, odor,
|
|
source random stream and full seed, not just the number of epochs.
|
|
|
|
- D=0, frozen, random reward and CS-only use that identical CS prefix.
|
|
- DAN-only uses the corresponding removed-CS/yoked epoch positions. It has
|
|
**zero CS exposure**, not equal CS exposure; this is an intended control.
|
|
- Unpaired uses the earliest epoch boundary that has consumed the same ordered
|
|
CS prefix, including US-only epochs already inserted before that boundary.
|
|
Its terminal checkpoint includes the entire 150-epoch inventory.
|
|
|
|
Unpaired intermediate US counts and elapsed time can differ from paired.
|
|
Random-reward intermediate US counts can also differ. These differences must
|
|
be reported rather than called fully matched exposure. All complete terminal
|
|
inventories remain fixed by the original proposal. The terminal gate, not the
|
|
most favorable intermediate point, decides the result.
|
|
|
|
Reversal and no-reversal use each arm's own kth reinforcement epoch boundary.
|
|
Their intermediate CS prefixes may differ because their reinforced cues differ;
|
|
their complete 100-epoch inventories remain fixed. The signed readout always
|
|
keeps the original acquisition cue orientation and original pre baseline.
|
|
|
|
## Inventory, not approval
|
|
|
|
Under these choices the pure planner is expected to enumerate 9,440 probes
|
|
(1,132.8 biological seconds), in addition to the existing 10,760 seconds of
|
|
training, controls, reversal and continuous idle. This arithmetic is not a
|
|
measured wall-time or disk estimate and excludes engineering validation,
|
|
encoding, output, regressions and reserves. Test fixtures use synthetic masters;
|
|
none is adopted as a scientific master seed.
|
|
|
|
Before any scientific run, complete the actual input/state/delta file bindings,
|
|
exact event-to-eligibility update coordinator, implemented assay gates and a
|
|
finite resource plan. Register the protocol and bounded implementation check
|
|
before observing scientific outcomes. Only after those checks may the staged
|
|
acquisition suite run. A failed acquisition is sealed as failure; it must not
|
|
trigger more pairings, parameter changes, odor reselection or control removal.
|